Sustainability Progress
Building Efficiency Project
This project will conduct facilities improvement measures to 18 buildings on Main Campus. Projected annual utility savings are estimated at $352,000 with an additional $25,000 in operational savings. Annual carbon dioxide (CO2) savings are projected at 2,226 metric tons.
Anticipated Construction Start: ¹ó²¹±ô±ôÌý2024
Anticipated Completion: Fall 2025
Budget: $5,775,000
Number of buildings: 18
East Campus Solar Array
Current plans encompass the construction of a 1.1 megawatt (MW) ground-mounted solar array on a two-acre site east of parking Lot 566.
Anticipated Construction Start: June 2025
Anticipated Operational Date: ´³²¹²Ô³Ü²¹°ù²âÌý2026
Total Project Cost: $7,817,250
Size: 2 acres
ENVD Window Retrofit
ÃÛÌÒ´«Ã½ÆÆ½â°æÏÂÔØ will retrofit the windows of the Environmental Design (ENVD) building using INOVUES’ energy-saving window technology.
Anticipated construction start:Â Summer 2025
Anticipated completion:Â Fall 2025
Budget:Ìý$500,000
Geothermal Studies
ÃÛÌÒ´«Ã½ÆÆ½â°æÏÂÔØ is studying whether geothermal energy is feasible for the campus. If successful, this renewable energy solution would help reduce reliance on fossil fuels for heating and cooling, providing a more sustainable alternative that aligns with the CAP’s goal of achieving carbon neutrality by no later than 2050.
Anticipated construction start:Â Summer 2024
Anticipated completion:Â Spring 2026
Budget:Ìý$700,000
Virtual Net Metering Program
ÃÛÌÒ´«Ã½ÆÆ½â°æÏÂÔØ is taking advantage of virtual net metering, an innovative new program made possible by Colorado Senate Bill 21-26 in 2021, which enables organizations to benefit from the energy produced by offsite solar installations. The university will utilize solar power generated by the offsite net-metering solar project, without needing to install solar onsite. The offsite solar project feeds directly into the electric grid, with ÃÛÌÒ´«Ã½ÆÆ½â°æÏÂÔØ receiving credits for the renewable energy produced on its electric bills.
Anticipated construction start:Â Summer 2025
Anticipated completion:Â Spring 2026
Budget:Ìý°Õµþ¶Ù
²Ñ±ð²µ²¹·É²¹³Ù³Ù²õ:Ìý5-MWDC